Projects and References

 

 

± International Projects


± Projects Completed in Turkey

PROJECT OWNER NAME and DESCRIPTION OF THE PROJECT QUANTITY
ÖZALTIN HOTEL MANAGEMENT INC.

CPT testing at 9 locations within the site investigation studies of Antalya Olympic Arena Project
19.04.2013-22.04.2013

9 CPT
KAHYAM TOURISM and MANAGEMENT LTD. CO.

Site investigation including drilling of 3 boreholes having a total depth of 105m, laboratory testing and geotechnical reporting works of a project within the borders of Çankaya district, Ankara
04.04.2013-19.04.2013

105 m
ALİ ACAR CONS.TRD. CO. - ACARKENT CONS.TRD.LTD.CO. PARTNERSHIP

Site investigation including drilling of 8 boreholes having a total depth of 220 m, CPT at 5 locations, laboratory testing and geotechnical reporting works of Samsun - 33.000 Seat Capacity - Tekkeköy Stadium
25.03.2013-16.04.2013

220 m,

5 CPT
SEMBOL LIBYA FOR CONSTRUCTION (JSC)

Preparation of Geotechnical Evaluation Report for Benghazi Multiuse Complex
20.03.2013-09.04.2013

 
AKDENİZLİ ELECTRICITY PRODUCTION INC.

Assessment of Slope Stability for Service Roads and Accumulation Areas for Bağıştaş II Dam ve HEPP Project
15.03.2013-01.04.2013

 
TÜRKERLER - RENKYOL PARTNERSHIP

Site investigation including drilling of 18 boreholes having a total depth of 449m, laboratory testing and geotechnical reporting works of a project within the borders of Çankaya district, Ankara
01.03.2013-22.03.2013

449 m
SCHNABEL ENGINEERING LLC

Site investigation including drilling of 5 boreholes having a total depth of 92m, test pitting at 6 locations, laboratory testing and geotechnical reporting works of Ankara NEC project within the borders of Çankaya district, Ankara
21.01.2013-15.02.2013

92 m
YENİ BELEN ENERGY ELECTRICITY PRODUCTION IND.TRD.INC.

Geotechnical Evaluation Report for Şenbük Wind Farm Project, Hatay
25.02.2013-04.03.2013

 
KOLİN CONSTRUCTION TOURISM IND.TRD. INC.

Site investigation including drilling of 11 boreholes having a total depth of 285.5m, laboratory testing and geotechnical reporting works of Buğdaylı and Mimar Sinan Bridges within the scope of Kayseri Northbound Passage Variant Supply Construction
15.02.2013-26.02.2013

285.5 m
MEHMET SELVİ CONSTRUCTION AND REAL ESTATE INV. CONS.TRD. LTD.CO.

Site investigation including drilling of 5 boreholes having a total depth of 200 m, laboratory testing and geotechnical reporting works of a project within the borders of Etimesgut district, Ankara
25.01.2013-04.02.2013

200 m
KİLCİ ENGINEERING CONSULTANCY PROJECT CONS. IND. TRD.LTD.CO.

CPT testing at 8 locations within the site investigation studies of Ağrı Patnos Penitentiary Construction Project
25.01.2013-30.01.2013

8 CPT
ÇESKON ENGINEERING CONS. TRD. INC.

Site investigation including drilling of 3 boreholes having a total depth of 60 m, geotechnical reporting works of Aselsan Facility at Akyurt, Ankara
01.01.2013-10.01.2013

60 m
ŞAHİKA GROUP CONS. CONSULTANCY EN.TEXT. NUT. FOREIGN TRD. IND. INC.

Site investigation including drilling of 6 boreholes having a total depth of 240 m, laboratory testing, design of deep foundation systems and geotechnical reporting works of a real estate project in Çankaya, Ankara
25.12.2012-01.03.2013

240 m
COMSA AÇILIM CONS.IND.TRD. and LTD.CO. PARTNERSHIP

Site investigation including drilling of 1 borehole having a total depth of 28 m, acquisition of inclinometer readings  for Ankara Metro Project
20.12.2012-06.02.2013

28 m,

2 INC.
K-G REAL ESTATE CONS. TOUR. IND. TRD. LTD. CO.

Site investigation including drilling of 6 boreholes having a total depth of 320 m, and geotechnical reporting for a project at Çankaya,Ankara
10.12.2012-25.12.2012

320 m
HALİL GÜRPINAR

CPT testing at Ivedik Organized Industrial Zone, Ankara
27.11.2012-28.11.2012

1 CPT
LİNATEKS TEXTILE IMP.EXP.IND. and TRD.LTD.CO.

Site investigation including drilling of 2 boreholes having a total depth of 50 m, laboratory testing and geotechnical reporting for a residential project at Bilkent,Ankara
20.11.2012-30.11.2012

50 m
ANKARA ETLİK HOSPITAL HEALTH SERVICES MANAGEMENT and INVESTMENT INC.

Assessment of Site Specific Seismic Hazard at
Etlik Integrated Health Campus Project Site, Ankara
08.11.2012-12.11.2012

 
SENTEZ CONS. SOFTWARE IND. TRD. LTD. CO.

CPT testing at 2 locations, piezometer testing at 27 locations, and inclinometer applications at Gemlik, Bursa
07.11.2012-06.02.2013

2 PIEZ

AKGÜL DOĞUKAN CONS., REAL ESTATE, CONSULTING, PROJECT TOUR.TRD.IND. INC.

Site investigation including drilling of 1 borehole having a total depth of 19.90 m, and geotechnical reporting for a project at Çankaya,Ankara
07.11.2012-08.11.2012

19.9 m
ENDER EBCED PARTNERSHIP

Site investigation including drilling of 3 boreholes having a total depth of 55.5 m, and geotechnical reporting for a project at Çankaya,Ankara
03.11.2012-08.2012

55.5 m
ETİ MINE WORKS GENERAL MANAGEMENT

Site investigation including drilling of 10 boreholes having a total depth of 1000 m, conducting 2 well pumping tests, 40 in-situ permeability tests and geotechnical reporting for Hisarcık Open Pit Field.
15.09.2012-03.11.2012

 
SENTEZ CONS. SOFTWARE IND. TRD. LTD. CO.

Site investigation including drilling of boreholes having a total depth of 144 m, 3 CPT testing, 13 piezometer tests, inclinometer applications and geotechnical reporting at Gemlik, Bursa
15.09.2012-03.11.2012

144 m,
3 CPT,
13 INC

İKSA ENGINEERING CONSULTING CONS. IND. and TRD. LTD. CO.

Site investigation including drilling of 7 boreholes having a total depth of 350 m, and inclinometer applications for Altın Koza University site, Ankara
05.09.2012-30.09.2012

350 m,
7 INC

BAR-SU PROJECT and CONS. TRD. LTD. CO.

CPT testing at 8 locations for Menzelet Irrigation Project, Stages 2 & 3,
Türkoğlu, Kahramanmaraş
04.09.2012-07.09.2012

8 CPT
S.S. DOSTLAR ÇİFTLİKEVLERİ RESIDENCE COOP.

Site investigation including drilling of 5 boreholes having a total depth of 100 m, laboratory testing for a residential area at Gedikli Village, Polatlı, Ankara
10.08.2012-31.08.2012

100 m
AKDENİZ UNIVERSITY BAP COORDINATION UNIT

Site investigation including drilling of  boreholes up to 280 m total depth, and 10 CPT tests within the scope of Project No. 2011.02.0121.045
01.08.2012-27.08.2012

280 m,

5 CPT
YILDIZLAR CONSTRUCTION AND IND. TRD. INC.

Site investigation including drilling of 9 boreholes having a total depth of 315 m, laboratory testing, seismic refraction, resistivity tests and geotechnical report preparation for a project at Çankaya, Ankara
28.07.2012-16.08.2012

315 m,
3 SREF,

2 RES
KUR CONSTRUCTION AND IND. INC.

Site investigation including drilling of 4 boreholes having a total depth of 170 m, laboratory testing and geotechnical report preparation for a project at Yenimahalle, Ankara
25.07.2012-15.08.2012

170 m
İKSA ENGINEERING CONSULTING CONS. IND. and TRD. LTD. CO.

Site investigation including drilling of 5 boreholes having a total depth of 150 m, pressuremeter tests, laboratory testing and geotechnical report preparation for a project at Çankaya, Ankara
25.07.2012-15.08.2012

150 m,

5 PMT
İKSA ENGINEERING CONSULTING CONS. IND. and TRD. LTD. CO.

Site investigation including drilling of 4 boreholes having a total depth of 140 m, laboratory testing and geotechnical report preparation for a project at Çankaya, Ankara
25.07.2012-15.08.2012

140 m
ERYAP CONSTRUCTION AND TRD. INC.

CPT testing at 3 locations for a project at Yenikent, Sincan, Ankara
22.07.2012-23.07.2012

3 CPT

DEM-AY ARCHITECTURE REAL ESTATE ENGINEERING CONS.

LTD.CO.

Site investigation including drilling of 10 boreholes having a total depth of 300 m, laboratory testing and geotechnical report preparation for a project at Parcel No. 28771/1, Ankara
22.07.2012-10.08.2012

300 m

DEM-AY ARCHITECTURE REAL ESTATE ENGINEERING CONS.

LTD.CO.

Site investigation including drilling of 4 boreholes having a total depth of 140 m, laboratory testing and geotechnical report preparation for a project at Parcel No. 28714/1, Ankara
20.07.2012-31.07.2012

140 m
MİTAŞ BOLT IND. AND TRD. INC.

Site investigation including drilling of 5 boreholes having a total depth of 150 m, for a project at Başkent Organized Industrial Zone, Ankara
15.07.2012-26.07.2012

150 m

DEM-AY ARCHITECTURE REAL ESTATE ENGINEERING CONS.

LTD.CO.

Site investigation including drilling of 8 boreholes having a total depth of 180 m, laboratory testing and geotechnical report preparation for a project at Parcel No. 28775/1, Ankara
15.07.2012-25.07.2012

180 m
HABAŞ INDUSTRIAL AND MEDICAL GAS PRODUCTION INC.

Site investigation including drilling of 13 boreholes having a total depth of 325 m, laboratory testing, seismic refraction, resistivity, microtremor testing and geotechnical report preparation for an industrial project at Polatlı, Ankara
10.07.2012-02.08.2012

325 m,
9 SREF,
9 RES,

4 MT
EREĞLİ IRON AND STEEL PRODUCTION PLANT TRD.INC.

Site investigation including drilling of 52 boreholes having a total depth of 1630 m, laboratory testing, 69 field vane shear tests, 37 pressuremeter tests, 40 CPT tests for 3rd Rolling Plant Investments at Ereğli
06.07.2012-15.12.2012

1630 m,
69 FVT,
37 PMT,

40 CPT

DEM-AY ARCHITECTURE REAL ESTATE ENGINEERING CONS.LTD.CO.

Site investigation including drilling of 10 boreholes having a total depth of 300 m, laboratory testing and geotechnical report preparation for a project at Parcel No. 28515/3, Ankara
01.07.2012-15.07.2012

300 m
ESTA CONSTRUCTION IND. TRD.LTD.CO.

Site investigation including drilling of 12 boreholes having a total depth of 180 m, pressuremeter, CPT, geophysical testing laboratory testing and geotechnical report preparation for a residential complex project at Uşak
01.07.2012-30.07.2012

180 m,
12 PMT,
26 CPT,

6 MT
NÖMAYG J.V.

CPT testing and reporting at 31 locations along the planned route of Gebze-İzmir Highway Project
01.07.2012-09.07.2012

31 CPT
TÜRKERLER CONS. TOUR. MINING ENERGY PROD. TRD.IND.INC.

Site investigation including drilling of 41 boreholes having a total depth of 1429 m, resistivity and microtremor testing, laboratory testing, geotechnical report and report preparation for deep excavation and retaining structure detailing for a multiuse complex project at Çankaya, Ankara
25.06.2012-31.12.2012

1429 m,
4 RES,

8 MT
ANSET PRIVATE HEALTHCARE AND EDUCATION CULTURE CONS. TRD. LTD.CO.

Preparation of technical guidelines and bidding documents for microzoning studies for the city of Antalya
20.06.2012-10.04.2013

 
DELTA EARTH SCIENCES ENGINEERING DRILLING CONS. TRD.LTD.CO.

Pressuremeter testing and data reporting within the scope of Çankaya University campus construction
14.06.2012-20.06.2012

40 PMT
YDA ARAS PARTNERSHIP

Site investigation including drilling of 3 boreholes having a total depth of 90 m, inclinometer readings, geotechnical report preparation for at Karabük
08.06.2012-14.06.2012

90 m,

3 INC
YÜKSEL DOMANİÇ ENGINEERING LTD. CO.

Site investigation including drilling of x boreholes having a total depth of x m, pressuremeter testing, inclinometer reading, laboratory testing, preparation of final geotechnical evaluation reports for Gebze-Orhangazi-İzmir Highway, Umurbey-Ovaakça Section
01.06.2012-15.02.2013

 
TEPE CONSTRUCTION IND. INC.

Site investigation including drilling of 2 boreholes having a total depth of 40 m, laboratory testing and geotechnical report preparation for Beytepe Student Dormitory Construction Project
01.06.2012-13.06.2012

40 m
ZAFER CONTR. CONS. AND TRD. INC.

Preparation of a geotechnical report for detention facility in Parvan (DFIP) Bagram Airbase, Afghanistan
05.06.2012-12.06.2012

 
ÖZTAŞ CONS. and CONS. MAT. TRD. INC.
Site investigation including drilling of 16 boreholes having a total depth of 480 m, laboratory testing, geotechnical report preparation and design of deep foundation systems for a project at Seyitgazi, Eskişehir
01.05.2012-09.07.2012
480 m
SİNPAŞ GYO INC.

Site investigation including drilling of boreholes having a total depth of 1920 m, pressuremeter testing, seismic refraction and resistivity testing, laboratory testing, geological mapping services and geotechnical report preparation for the project "The First" at Çankaya, Ankara
01.05.2012-11.06.2012

1920 m,
122 PMT,

12 SREF-RES
İKSA ENGINEERING CONSULTING CONS. IND. and TRD. LTD. CO.

Site investigation including drilling of boreholes having a total depth of 577 m, geophysical testing, plate load tests and laboratory testing for a project at Karakusunlar, Mamak, Ankara
15.05.2012-04.06.2012

577 m,
5 DES,
5 PYT

ALPASLAN II ENERGY PRODUCTION AND MINING IND AND TRD. INC.

Evaluation and development of a numerical model for the assessment of seismic performance of Alpaslan II Dam
15.05.2012-01.06.2012

 
FUGRO SİAL EARTH SCIENCES ENG.CONSULT. LTD.CO.

CPT testing at 11 locations at Yenişehir, Bursa
28.05.2012-01.06.2012

11 CPT
SİNPAŞ GYO INC.

Site investigation including drilling of boreholes having a total depth of 112 m, d laboratory testing, geological mapping services and geotechnical report preparation for the project "Incek Life" at Ankara
01.05.1012-15.05.2012

112 m
KOLİN CONS. TOURISM IND. AND TRD. INC.

CPT testing at 3 locations for Umurbey Valley Irrigation Project, Drainage Pump Station
12.05.2012-15.05.2012

3 CPT
GEOMAR CONS. AND INFRASTRUCTURE INC.

Site investigation including drilling of 4 boreholes having a total depth of 72 m, CPT testing at 4 locations, laboratory testing and geotechnical report preparation for the project "Soyak Mavişehir" at , Karşıyaka, İzmir
28.04.2012-08.05.2012

72 m,

4 CPT
SİNPAŞ CONS. INDUSTRY AND TRD. INC.

Preparation of slope stability measures for Parcels P1 and P2, and deep foundation design for structures at Parcel P1 for Güneypark Project, Ankara
07.04.2012-07.05.2012

 
S.S. YENİ GÜRDAĞ RESIDENCE COOP.

Site investigation including drilling of 3 boreholes having a total depth of 60 m, inclinometer monitoring services for a project at Çankaya, Ankara
20.04.2012-04.05.2012

60 m,

3 INC
İKSA ENGINEERING CONSULTING CONS. IND. and TRD. LTD. CO.

Site investigation including drilling of boreholes having a total depth of 384 m, pressuremeter testing, resistivity tests and laboratory testing for a project at Karakusunlar District, Çankaya, Ankara
20.01.2012-01.02.2012

384 m,
10 PMT,

4 DES
KAVUKLAR FUEL AUTO. CONS. IND. AND TRD. INC.

Site investigation including drilling of 36 boreholes having a total depth of 2225 m, pressuremeter testing at 68 locations, MASW testing at 17 locations, resistivity testing at 6 locations, microtremor tests at 4 locations, 7 seismic refraction tests, laboratory testing, site specific seismic hazard assessment and evaluation of liquefaction triggerring potential, design of excavation-support and deep foundation systems, and evaluation of seismic soil-pile-raft interaction for the project "Bornova Cadde" at Bornova, İzmir
03.03.2012-05.05.2013

2225 m,
68 PMT,
17 MASW,
6 DES,
4 MT,

7 SREF
HİDRODİZAYN ENGINEERING CONSULTING CONS. AND TRD INC.

Evaluation of seismic stability and numerical modeling services for water intake and outflow structures of Alpaslan II Dam
15.04.2012-30.04.2012

 
SALINI SPA

Geotechnical and earthquake engineering consultancy services for bid preparation stage of Northern Marmara Motorway Project
18.04.2012-27.04.2012

 
TEPE CONS. IND. INC.

Site investigation including drilling of 2 boreholes having a total depth of 30 m, laboratory testing and geotechnical reporting services within the scope of retrofit works of Hacettepe University Hospitals, Ankara
18.04.2012-26.04.2012

30 m
AKDENİZLİ ELECTRICITY PRODUCTION INC.

10 resistivity tests for Bağıştaş 2 Dam site.
14.04.2012-18.04.2012

10 DES
META NICKEL COBALT MINING IND. AND TRD. INC.

CPT testing at 4 locations in Gordes, Manisa
02.04.2012-06.04.2012

4 CPT
DSGN ON ARCH. PRJ.CONTR.CONS. FOREIGN TRD. AND FURN.IND.LTD.CO.

CPT testing at 8 locations at Başkent Organized Industrial Zone
28.03.2012-03.04.2012

8 CPT












± Completed Water Drilling Projects